Friday, March 23, 2007

Collecting wave energy

"... The 1:10 machine will be controlled in exactly the same way as the full-scale machine and this means that it will provide us with practical operational experience ...

... The test machine has an output of 5.5 kilowatt and can generate electrical power corresponding to the electrical power consumption of two single-family houses.
The plan is that it will remain in Nissum Bredning for three years, but Wave Star Energy has already begun work on the construction of a 1:2 model of the 3 megawatt machine, which is the ultimate goal. ..."

Nice, ah!? :D




No comments:

Post a Comment